Access Network #
How hosts and operators physically attach to the site’s access switch, starting with a tidier management path.
✓ 0 |
↻ 0 |
⏳ 2
(2 total)
Legend: β Complete | π In Progress | β³ Planned
Value objectives: Contained failure, One part-time operator can run it
- β³ A labeled block of access switch ports for plugging in management devices
- β³ Unused access switch ports placed in a dead-end VLAN, so a device plugged into one reaches nothing
Project plan: Access Network